Aero City Underground pt XVII: the build day 12

[7th November 2012]

Day 12:

All nicely finished off and still drying out. I hadn’t realised how much water comes out of a plastering job and how long it takes to dry.

The floor has been levelled out too!!!

The plumbing is in place for the toilet: the waste pipe is taken outside, past the sump pump outlet, and across to the soil pipe with nicely swept bends!!!

Cheers,

Ralph.