Latest Posts
Aero City Underground pt XIX: pcp!
[16th November 2012] I went to pick this up from the courier today: p00p, ch0p ‘n’ pump π Cheers, Ralph.
Aero City Underground pt XVIII: the build day 13
[8th November 2012] Day 13: The guys did me a few favours before they left: An extractor fan was fitted and a toilet door. They also left me some beers to get the room started: how awesomtastic is that??? I…
Read more
Aero City Underground pt XVII: the build day 12
[7th November 2012] Day 12: All nicely finished off and still drying out. I hadn’t realised how much water comes out of a plastering job and how long it takes to dry. The floor has been levelled out too!!! The…
Read more
Aero City Underground pt XVI: the build day 11
[5th November 2012] Day 11: The plastering is finished, the skirting boards are in and the guys even built me a platform to get my Aero City cabs into the Cellar. This allowed an extra stair and head clearance for…
Read more
Aero City Underground pt XV: the build day 10
[3rd November 2012] Day 10: The plaster boarding is now finished and the plastering is completed in the main room!!! I’m like a giddy kiddy now π Cheers, Ralph.
Aero City Underground pt XIV: where is stuff?
These pictures are for future reference. So if, for example, I decide I want to put up a picture; I avoid central heating pipes and electrical cables etc π Cheers, Ralph.
Aero City Underground pt XIII: the build day 9
[2nd November 2012] Day 9: Ooooooh!!!!! Plaster on the walls!!! Also, the boarding up the stairs is almost finished. Cheers, Ralph.
Aero City Underground pt XII: the build day 8
[1st November 2012] Day 8: The edging strips are going up and the plaster boarding is complete in the main room. The room really is looking like my original plan and the space along the back wall is large enough…
Read more
Aero City Underground pt XI: the build day 7
[31st October 2012] Day 7: The plasterboard is coming along nicely and the sockets are finding their new homes. Temporary light fittings are in place too so we can all see where we’re lookin’ and because I haven’t decided on…
Read more
Aero City Underground pt X: the build day 6
[30th October 2012] Day 6: The “behind the scenes” stuff in the toilet is going in the main part is the board behind the plasterboard so I can mount a sink on the wall. The spaces for the electrical sockets…
Read more