Aero City Underground pt XVII: the build day 12
[7th November 2012]
Day 12:
All nicely finished off and still drying out. I hadn’t realised how much water comes out of a plastering job and how long it takes to dry.
The floor has been levelled out too!!!
The plumbing is in place for the toilet: the waste pipe is taken outside, past the sump pump outlet, and across to the soil pipe with nicely swept bends!!!
Cheers,
Ralph.